Aragonite Permit Attachment 10—Design Drawings: Clean Harbors LLC
P&ID Legend Sheet 1 (unstamped)
Revision: 3
Master Interlock System, Sheet 2
Revision: 24
Operating Interlock System, Sheet 1
Revision: 19
Operating Interlock System, Sheet 2
Revision: 11
P&ID Slagging Rotary Kiln System
Revision: 19
P&ID Kiln Feed System
Revision: 20
P&ID Kiln Miscellaneous Systems
Revision: 8
P&ID Front Wall Burner Controls, Sheet 1
Revision: 27
P&ID Front Wall Burner Controls, Sheet 2
Revision: 37
P&ID Afterburner Controls, Sheet 1
Revision: 23
P&ID Afterburner Controls, Sheet 2
Revision: 26
P&ID Afterburner Controls, Sheet 3
Revision: 14
P&ID Deslagging System
Revision: 9
P&ID Spray Dryer Quench Tower
Revision: 21
P&ID Baghouse
Revision: 14
P&ID Saturator & Scrubber
Revision: 15
P&ID 1st Stage Neutralization System
Revision: 28
P&ID 2nd Stage Neutralization System
Revision: 22
P&ID Soda Ash Storage Handling System
Revision: 8
P&ID Spray Dryer Feed System
Revision: 22
P&ID Cooling Tower
Revision: 8
P&ID Wet Electrostatic Precipitator
Revision: 4
P&ID I.D. Fan and Stack
Revision: 4
P&ID Emergency Air/Water
Revision: 8
P&ID Residue Handling Building
Revision: 5
Piping Diagram CEM System #1
Revision: 4
Piping Diagram CEM System #2
Revision: 2
Activated Carbon Silo
Revision: 2
PAC Dosing System Train 1
Revision: 3
PAC Dosing System Train 3
Revision: 3
P&ID Liquid Unloading Pumps
Revision: 7
P&ID Waste Liquid Transfer Pumps
Revision: 12
P&ID Direct Burn Waste Liquid Unloading
Revision: 25
P&ID Direct Burn Waste Liquid Unloading
Revision: 7
Sludge Pad Direct Burn Station
Revision: 11
P&ID Feed Tanks Sheet 1
Revision: 3
P&ID Feed Tanks Sheet 2
Revision: 4
P&ID Liquids Storage
Revision: 4
P&ID Liquids Storage
Revision: 4
P&ID Liquids Storage Tanks, PE Stamped 01/15/21
Revision: 8
P&ID Liquids Storage Tanks
Revision: 6
P&ID Liquids Storage Tanks, PE Stamped 2/22/10
Revision: 7
P&ID Liquids Storage Tanks
Revision: 9
P&ID Blend & Transfer Pumps
Revision: 4
P&ID Blended Liquid Feed & Transfer Pumps
Revision: 5
P&ID Aqueous Feed Pumps
Revision: 5
P&ID Hydrocarbon Vent System
Revision: 19A
P&ID Vent System and Combustibles Analyzers
Revision: 6
P&ID Compressed Gas Waste
Revision: 6
P&ID Solids Handling
Revision: 4
P&ID Sludge Handling
Revision: 19
Bldg. E-4 Decant P&ID
Revision: 8
P&ID Combustibles Monitoring System
Revision: 24
P&ID Comb. Air Carbon Adsorption System
Revision: 4
Revision: 8
P&ID Area Sumps Sheet 1
Revision: 5
P&ID Area Sumps Sheet 2
Revision: 12
P&ID Air Compressor System
Revision: 7
P&ID Nitrogen & Fuel Oil
Revision: 15
P&ID Plant, Instrument Air & Propane
Revision: 14
P&ID Plant Water, Runoff Water, Fire Water
Revision: 4
P&ID Potable Water
Revision: 11
P&ID Plant Water
Revision: 14
Komar Shredder Feed System
Revision: 0
Komar Airlock
Revision: 1
Komar Dual Shredder System
Revision: 0
Screw Conveyor to Auger Kiln Feed
Revision: 0
Komar Kiln Feed Auger System
Revision: 0
Overall Flow Scheme
Revision: 15
Process Flow Diagram – Typical December 1997
Revision: 1
Process Flow Diagram – Typical December 1997
Revision: 1
Liquids Handling (Tank Farm) – Flowsheet
Revision: 12
Liquids Handling (Tank Farm) – Flowsheet
Revision: 7
Direct Burn & Cylinder Material Handling – Flowsheet
Revision: 12
Process Flow Diagram – Barrel Handling
Revision: 9
Sludge and Bulk Solids Handling – Flowsheet
Revision: 9
Closed Vent System Flowsheet
Revision: 10
Hydrocarbon Vent System Flow Diagram
Revision: 9
Site Plan
Revision: 13
Plot Plan
Revision: 36
Sump and Sump Pump Location
Revision: 27
Safety Equipment Plan
Revision: 29
Cylinder Storage Area Plot Plan
Revision: 0
Container Storage Building Plan
Revision: 18
Material Handling Area Plan
Revision: 11
Shredder Tower Barrel Storage Area
Revision: 2
Explosives Handling and Storage
Revision: 0
Area Site Plan
Revision: 5
* NOTE: These drawings include interlocks that are not required by this permit. They are required by other permits and are included in these drawings to avoid the confusion caused by two sets of interlock drawings.