Division of Drinking Water
Lead and Copper Sampling
Lead and copper enter drinking water primarily through plumbing materials. Water systems are required to collect lead and copper samples at customer taps. If more than 10% of samples collected are above the limits for lead and copper set by the EPA, the system must undertake a number of additional actions to control corrosion.
Water system deadlines
Sept. 30, 2026 – Routine lead and copper samples are due for some water systems. You can check your monitoring schedules at waterlink.utah.gov
Nov. 1, 2027 – Submit via email the list of schools and child care centers served by your water system. More information on EPA’s website
Routine sampling
Lead and copper samples must be collected and submitted to the Division according to your system’s monitoring schedule (find it at WaterLink.utah.gov) and Sample Site Plan.
Schools & childcare sampling requirements
Under the Lead and Copper Rule Improvements (LCRI), all water systems who serve schools and licensed child care centers will have new public education and sampling requirements.
Understanding your results
Learn how to evaluate lead and copper results, do your 90th percentile calculation, and take follow-up samples.
Water Quality Parameter (WQP) Sampling
Certain water systems are required to collect Water Quality Parameter (WQP) samples to verify that their water chemistry is stable and is not corrosive to plumbing materials. For more information on requirements and sampling methods, please refer to our Guidance for Collecting Water Quality Parameter (WQP) Samples Under the Lead and Copper Rule.
Corrosion control
Systems who exceed the action level for lead or copper may be required to do a corrosion control study and introduce new treatment into their system to prevent lead and copper from leaching into the water.
Consumer & public notification
Help residents understand their lead and copper results and teach them the best practices for reducing exposure.
24-Hour Public Notice Requirement
If a water system exceeds the action level for lead, they are required to issue a public notice within 24 hours.
Consumer Confidence Reports
In the yearly Consumer Confidence Report (CCR), every community system must report the total number of lead and copper samples taken, the most recent 90th percentile value for lead and copper, and the number of sampling sites exceeding the action level. Systems are now also required to include information about their service line inventories (see all upcoming lead and copper rule deadlines).
Sample site plan
All community and non-transient non-community public water systems are required to have and maintain an approved LCR Sample Site Plan. The Division has created an easy to use template that can be used and submitted through a WaterLink portal account.
FAQs
What if I completed my service line inventory and everything was non-lead. Do I still need to sample for lead?
Yes, service lines are just one of many plumbing components that can contribute to lead release in drinking water. Goosenecks, plumbing and solder within buildings, and faucets themselves can lead to high lead levels.
When does the 24 hour clock start for the public notice for a lead action level exceedance?
The clock starts when the water system learns of the action level exceedance. This could be when the system does their 90th percentile calculation or when the Division does the calculation and notifies the water system.
Is a lead or copper action level exceedance a violation?
No, having a lead or copper exceedance does not result in a violation. A water system will only receive a violation if they do not complete the required follow up actions associated with a lead or copper exceedance.
When do I need to submit a sample site plan?
You do not need to submit to DDW your sample site plan each time you sample for lead and copper. It only needs to be submitted when you make a change to the sample site plan.
How do I submit my sample site plan?
It can be downloaded and emailed as an attachment to [email protected]
How do I determine what sites to sample from?
Use the tiering criteria on the materials worksheet of the sample site plan.
Forms
Looking for a specific form or handout? We’ve compiled them all here.
Questions?
Dylan Martinez
[email protected]
(385) 278-3807
