Division of Water Quality

General Construction (Storm Water): UPDES Permits

Utah requires an UPDES construction storm water permit for soil disturbances of an acre or more, including less than an acre if it is part of a common plan of development or sale (that is over an acre). Soil disturbance is described as clearing, grading, or excavating. These permits are necessary to ensure that discharges from construction sites will not adversely impact any applicable water quality standard.

What type of permit do I need?

 

General Permit

This permit covers all types of construction disturbances of an acre or more. This permit also covers non-residential disturbances less than an acre that are part of a common plan of development.

Common Plan Permit

This permit covers disturbances of an acre or less on a single residential lot that were subdivided for separate sale after Oct. 1992.

Construction Dewatering / Hydrostatic Testing (CDHTs)

Covers in-stream, surface-area, and groundwater dewatering, in addition to hydrostatic testing.

Contacts

Manager
Jeanne Riley
[email protected]
(385) 333-2445

Municipal Storm Water
Kelsee York
[email protected]
(385) 260-2760

CDHT Permits
Linsey Shafer
[email protected]
(385) 405- 4158

Construction Storm Water
James House
[email protected]
(385) 271-8380

Industrial Storm Water
Jordan Bryant
[email protected]
(385) 272-4894

Storm Water Specialist
Dylan Franzke
[email protected]
385-522-3084

Storm Water Database
[email protected]
(801) 536-4300