Tag: Mixed Waste Mixed Waste

Waste Permit:
EnergySolutions

EnergySolutions (formerly Envirocare of Utah) operates a commercial treatment, storage and disposal facility located in Tooele County, Utah. The facility is located five miles south of the Clive exit (Exit #49) on Interstate 80, which is approximately 80 miles west of Salt Lake City, Utah. The facility is one square mile in size and is …

Read More

Class A West Disposal Cell Infiltration and Transport Modeling Report:
EnergySolutions

License Amendment Request: Class A West Embankment Complete Report: EnergySolutions Class A West Disposal Cell Infiltration and Transport Modeling Report (80MB) The following are separated sections of the full report, presented here for your convenience, or if you have difficulty downloading the complete report document. EnergySolutions Class A West Disposal Cell Infiltration and Transport Modeling …

Read More

Depleted Uranium:
EnergySolutions

Depleted uranium, a byproduct of the uranium enrichment process, is initially less radioactive than naturally occurring uranium. However, the radioactivity of depleted uranium increases rather than decreases over time, posing significant challenges for safe and effective long-term disposal. Natural uranium is composed of three primary isotopes: U-234, U-235, and U-238. Nuclear reactors use a higher …

Read More

Depleted Uranium Performance Assessment:
EnergySolutions

Revision 2 of Compliance Report Update July 11, 2014 Revision 2 of the Report, “Utah Low-Level Radioactive Waste Disposal License (RML UT2300249)—Condition 35 Compliance Report,” which includes responses to the Round 3 Interrogatories (as Appendix E) and responses to all other prior Interrogatories. As an aid to the reviewers, attached are redline-strikeout versions of Appendix A …

Read More

Depleted Uranium Compliance Report:
EnergySolutions

Supplemental Information Clive DU PA Model (Version 1.2) Both files constitute the modeling files for the Clive facility. The file with the .gsm extension is needed to run the full, commercial GoldSim model. The file with the .gsp extension should be used with the GoldSim player version, which can be downloaded at no cost. Clive …

Read More

Depleted Uranium Performance Assessment DKU Rulemaking Record:
EnergySolutions

These are the documents prepared in association with the Radiation Control Board’s rule addressing depleted uranium. R313-25-8 Depleted Uranium Rulemaking (09/02/14) Basis for Proposal Final Record Applicable DRC Rules On April 2010, the Radiation Control Board approved a new rule that required EnergySolutions to conduct a performance assessment (PA) before disposing of large quantities of …

Read More

Depleted Uranium Performance Assessment Chronology:
EnergySolutions

Update July 25, 2019 Status of Interrogatories, July 2019. Update April 3, 2018 EnergySolutions Responses to Interrogatories Raised with Version 1.4 of the DU PA Model Update May 11, 2017 Interrogatories re: Depleted Uranium Performance Assessment, Model version 1.4 Update: December 6, 2016 Review of the DU PA , model version 1.4, will continue on …

Read More

Depleted Uranium History 2007-2010:
EnergySolutions

The following updates provide a history of depleted uranium (DU) shipments to Utah and Division of Radiation Control (DRC) rulemaking on DU disposal, including the requirements to prepare a performance assessment (PA) and other relevant documents. Update: December 8, 2010 EnergySolutions Seeks Extension on DU Performance Assessment EnergySolutions has asked for an extension to submit …

Read More

Blended Waste:
EnergySolutions

Jump to: Introduction News Utah’s Position Background Introduction Blended waste is an industry proposal to blend more concentrated radioactive waste with less concentrated radioactive waste. EnergySolutions is seeking federal and state approval to allow this option so it can ultimately dispose of waste that meets the Class A limit requirements of its Utah radioactive material …

Read More