Jump to:
2020 Public Notices:Waste Management and Radiation Control
Sunnyside Cogeneration Associates: Coal Combustion Residual (CCR) Ash #2 Landfill
- Public Notice
- Attachment 1: Application
- Attachment 2: Draft Permit
- Close of Comments: October 21, 2020, through November 20, 2020
- Public Hearing: None
- Contact (E-mail): Doug Taylor (dwtaylor@utah.gov)
- Type: Draft Permit
2023 Public Notice: Water Quality
Sunnyside Cogeneration Associates
- Public Notice
- Draft Permit
- Draft SOB
- Close of Comments: September 15, 2023
- Public Hearing: None
- Contact (E-mail): Jeff Komel (jkolmel@utah.gov)
- Type: Groundwater Permits
Sunnyside Cogeneration Associates Power Plant
- Public Notice
- Draft Permit
- FSSOB
- WLA
- WLA Summary
- Close of Comments: September 29, 2023
- Public Hearing: None
- Contact (E-mail): Jeff Studenka (jstudenka@utah.gov)
- Type: UPDES Discharge Permits
2020 Public Notices: Water Quality
Sunnyside Cogeneration Associates, Permit UGW570002
- Public Notice
- Ground Water Discharge Permit
- Statement of Basis
- Close of Comments: May 28, 2020
- Public Hearing: None
- Contact (E-mail): Wynn John (wjohn@utah.gov)
- Type: Ground Water Discharge Permit
2018 Public Notices
Sunnyside Cogeneration Associates, Permit UT0024759
- Public Notice
- Fact Sheet Statement of Basis
- Wasteload Analysis
- Draft Permit
- Close of Comments: January 25, 2019
- Public Hearing: None
- Contact (E-mail): Kelsey Christiansen (kelseychristiansen@utah.gov)
- Type: UPDES Discharge Permits
2014 Public Notices
Sunnyside Cogeneration Associates, Permit UGW070002
- Public Notice
- Draft Permit Letter
- Draft Plans and Specifications
- Construction Permit: Final
- Comment Response Summary: Final
- Construction Permit Application: Final
- Construction Drawings: Final
- Close of Comments: May 15, 2014
- Public Hearing: None
- Contact (Email): Woodrow Campbell (wwcampbell@utah.gov)
- Type: Construction Permits
2013 Public Notice
Sunnyside Cogeneration Associates Permit Notice
- Comment Response Summary and Additional Information (12/04/13)
- Public Notice
- Statement of Basis
- Permit
- Draft
- Final
- Site Map
- Cross Sections
- Ash Results
- Sampling and Analysis Plan
- Phase II Ash Landfill Construction
- Sediment Pond Design
- Close of Comments: August 22, 2013
- Public Hearing: None
- Contact (Email): Dan Hall (dhall@utah.gov)
- Type: Groundwater Permits
Sunnyside Cogeneration Associates(SCA) Draft Permit Renewal
- Public Notice
- Transmittal to SCA
- Publication Request
- Fact Sheet Statement of Basis
- Wasteload Analysis (WLA)
- Antidegradation Review
- Flow Data
- Draft Permit
- Close of Comments: June 17, 2013
- Public Hearing: None
- Contact (Email): Mike Herkimer (mherkimer@utah.gov)
- Type: UPDES
Discharge Permits
2012 Public Notice
Sunnyside Cogeneration Associates—Discharge Permit Renewal
- Public Notice
- Statement of Basis
- Draft Permit
- Close of Comments: March 15, 2012
- Public Hearing: None
- Contact (Email): Dan Hall (dhall@utah.gov)
- Type: Groundwater Permits