Category: Businesses and Facilities

  • Oldcastle Infrastructure

    Read about Utah DEQ’s regulatory interests in Oldcastle Infrastructure.

  • Tooele Army Depot

    2023 Public Notices Tooele Army Depot North: Post Closure and RCRA Part B Permit Consolidation Tooele Army Depot South Area: Stipulation and Consent Order 2020 Public Notices Tooele Army Depot South Area: Stipulation and Consent Order Tooele Army Depot South Area (TEAD-S) Class 3 Modification Request – Corrective Action Modifications Tooele Army Depot South Area:…

  • EDS Permit (TEAD S): Tooele Army Depot

    Tooele Army Depot, South Area (formerly Deseret Chemical Depot) Explosive Destruction System (EDS) Permit. Effective date of the Permit is August 5, 2015 and it expires in 10 years. The purpose of the EDS is to dispose of recovered chemical warfare materiel in a safe, environmentally sound manner. The EDS is a transportable unit with…

  • North (TEAD N), Part B Permit: Tooele Army Depot

    The Tooele Army Depot North (TEAD N) is located in north-central Utah. TEAD N is located in the Tooele Valley approximately two miles south of the city of Tooele and 35 miles southwest of Salt Lake City on about 27,000 acres of land. Approximately, 400 people work at TEAD N including 15 military and 385…

  • Permit (TEAD S): Tooele Army Depot

    The former mission of the TEAD-S for the storage and demilitarization of chemical warfare agents has been completed. The TEAD-S has ongoing environmental restoration projects and the Army is currently seeking new projects to be conducted at the depot. The TEAD-S Part B Hazardous Waste Storage (Not the Official Copy) Permit was issued in 1993,…

  • North Post-Closure Permit: Public Meeting: Tooele Army Depot

    The Tooele Army Depot (TEAD) will hold two public meetings on March 12, 2014, to discuss ground water cleanup, disposal area cleanups, and planned remedial investigation activities at TEAD The open house—from 5:00 p.m. to 7:00 p.m.— is an opportunity for members of the public to learn more about ground water remediation at TEAD, express…

  • Boulder Town

    Menu Solid Waste Facility Fact Sheet: Class IVb Landfill 2019 Public Notices Boulder Town: Permit Renewal Public Notice (155 KB) Draft Permit (1 MB) Comments: October 18, 2019, through November 18, 2019 Email Comments:dwmrcpublic@utah.gov Public Hearing: N/A Contact (Email): Brian Speer (bspeer@utah.gov) Type: Public Notice: Permit Renewal

  • Blue Mountain Meats

    Menu Solid Waste Facility Fact Sheet: Class IIIb Landfill 2019 Public Notices Blue Mountain Meats: Draft Permit Renewal Public Notice (143 KB) Draft Permit (671 KB) Comments: October 10, 2019, through November 12, 2019 Email Comments:dwmrcpublic@utah.gov Public Hearing: N/A Contact (Email): Brian Speer (bspeer@utah.gov) Type: Public Notice: Draft Permit Renewal

  • Wasatch Steel/WBH Enterprises

    2019 Public Notices Wasatch Steel/WBH Enterprises: Site Management Plan (SMP) Public Notice (177 KB) Draft Site Management Plan (5 MB) Comments: October 10, 2019, through November 11, 2019 Email Comments:dwmrcpublic@utah.gov Public Hearing: N/A Contact (Email):Dave Larsen (davelarsen@utah.gov) Type: Public Notice: Site Management Plan (SMP).

  • CERCLA (Superfund) Projects:
    Kennecott Utah Copper LLC

    Superfund Documents Five Year Review The United States Environmental Protection Agency Region VIII (EPA) and the Utah Department of Environmental Quality (UDEQ), are involved in a number of CERCLA actions at the Kennecott South and North Zones. Most recently the EPA and UDEQ announced the completion of the first Five Year Review of the response…

  • Natural Resource Damage (NRD) Project:
    Kennecott Utah Copper LLC

    Historic mining activities in the Oquirrh Mountains in southwest Salt Lake County led to the creation of two groundwater plumes in the principle aquifer of southwest Salt Lake County (Contaminated Zones Map). The two groundwater plumes contain elevated concentrations of sulfate and total dissolved solids (TDS) above the State of Utah primary drinking water standards.…

  • Bingham Creek: Natural Resource Damage (NRD) Three-Party Agreement: Kennecott Utah Copper LLC

    Completion of the Five Year Review Update: November 29, 2010 The EPA and UDEQ completed the Five Year Review of the selected remedies for Operable Units 1, 4, 5, 10, and 11 of the Kennecott South Zone in September 2010. During the review, the EPA and UDEQ examined current information, carried out site inspections, and…

  • Butterfield Creek: Natural Resource Damage (NRD) Three-Party Agreement:
    Kennecott Utah Copper LLC

    Completion of the Kennecott South Zone Five Year Review for Operable Units 3, 6, 7, 17 and 18 The Utah Department of Environmental Quality, Division of Environmental Response and Remediation (UDEQ/DERR), in cooperation with the U.S. Environmental Protection Agency Region VIII (EPA), has conducted a Five Year Review of the Kennecott South Zone Superfund Site—Operable…

  • Comment Response Summary: Natural Resource Damage (NRD) Three-Party Agreement:
    Kennecott Utah Copper LLC

    August 31, 2004 Introduction to the Comment Response Summary Responses to Common Comments Index of Commenters This index of commenters has been assembled to assist in locating responses to comments made by a specific person. Comments Received and Responses to Comments Contact Information For more information on this project, contact Mazie Cox (maziecox@utah.gov), (385) 391-8129.

  • Joint Proposal: Natural Resource Damage (NRD) Three-Party Agreement:
    Kennecott Utah Copper LLC

    June 11, 2004 Contact Information For more information on this project, contact Mazie Cox (maziecox@utah.gov), (385) 391-8129.

  • Document Repository: Natural Resource Damage (NRD) Project:
    Kennecott Utah Copper LLC

    Administrative Documents Natural Resource Damage Claim Annual Reports Construction and Testing Stakeholder Forum Meetings and Materials March 17, 2010 June 20, 2007 August 2, 2006 Spring 2006 Bingham Canyon reverse osmosis plant tour. October 12, 2005 January 12, 2005 Updates: Great Salt Lake Selenium Project, JVWCD Project schedule, and Consent Decree process. June 16, 2004…

Back to top