Category: Water Quality

  • Shootaring Canyon Uranium Mill:
    Anfield Resources Holding, Corp.

    Update February 1, 2016 On January 29, 2016 the Director of the Division of Waste Management and Radiation Control approved the Transfer of Control of the Shootaring Canyon Uranium Mill from Uranium One Americas, Inc. to Anfield Resources Holding Corporation (Anfield Resources). Transfer of control of the Mill also included changing the name of Radioactive…

  • November 6, 2019 Agenda: Water Quality Board

    Meeting Agenda Next Meeting December 3, 2019DEQ Board Room 1015195 North 1950 WestSalt Lake City, UT 84116 Attachment – Tour Itinerary

  • Oldcastle Infrastructure

    Read about Utah DEQ’s regulatory interests in Oldcastle Infrastructure.

  • Hunting and Fishing During Harmful Algal Blooms

    Can I Eat Fish from Waters Experiencing a Harmful Algal Bloom (HAB)? Toxins can accumulate in fish in waters experiencing a HAB. The highest concentrations are in the organs, particularly the liver, and fat deposits. Muscle tissue typically has lower toxin levels. Fish taken from waters with intermittent blooms are unlikely to have toxin levels…

  • Sample Letter for Approval for Wastewater Operator CEUs

    Date Wastewater Operator Certification ProgramDEQ/Division of Water QualityPO Box 144870Salt Lake City, Utah 84114-4870 Dear Council: The Anyplace Sewer District is sponsoring a CPR/First Aid training course on Sept.1, 20__. The relevant details are as follows: Please review and assign appropriate CEUs. If you require any additional information, please feel free to call. Sincerely, John…

  • Criteria for Wastewater Operator Training Courses

    All CEUs for certificate renewal are subject to review for approval to ensure that the training is applicable to wastewater works operation. The council shall review training documentation and recommend appropriate CEU or credit assignment.

  • Continuing Education (CEU) Requirements
    Wastewater Operator Certification Program

    Continuing education is required to maintain your wastewater certificate. Required CEUs must be earned during the 3 year period prior to the expiration date of the certificate. All CEUs are subject to review and approval to ensure that the training is related to the duties of a wastewater operator. Credit for a single training experience…

  • Forms & Fees: Wastewater Operator Certification Program

    I want to: Fees & payment Fee changes effective July 1, 2024 Exams Computer-based exam $50 + testing center fee Paper-based exam $200 Renewal Wastewater operator certificate renewal $75 Reinstatement Reinstate an expired/lapsed certificate Reinstatement fee charged each month late, maximum of 3 months, + Renewal fee. No reinstatement allowed more than 12 months late.…

  • Permit Modification and East Waste Rock Extension UGW350010:
    Kennecott Utah Copper LLC

    Project Summary Kennecott Utah Copper (KUC) is proposing to extend the footprint of the East Waste Rock Dumps to accommodate additional waste rock from mining operations. This project will require the relocation and reconstruction of the Eastside Collection System (ECS), the water collection and capture system for the dumps. The East Waste Rock Extension (EWRE)…

  • Cornerstone (Kennecott’s Expansion Project):
    Kennecott Utah Copper LLC

    Introduction In 2011 Kennecott Utah Copper LLC announced a proposal to expand the life of its Bingham Canyon Mine located in the southwest Salt Lake County. The expansion project, called “Cornerstone,” included widening the Bingham Canyon pit to accommodate operations focused on the mining and processing of ore located on the southeast margin of the…

  • Approval Order Modification Granted: Cornerstone:
    Kennecott Utah Copper LLC

    On June 27, 2011, the Division of Air Quality has approved Kennecott’s request to modify its Approval Order, outlined in a Notice of Intent (NOI). The NOI centered on a requested increase in the limit of the material moved from 197 to 260 million tons per year. The public comment period ended on March 20,…

  • Concentrator Request: Cornerstone:
    Kennecott Utah Copper LLC

    Addition of an Ore Grinding Line and an Ore Sorting Plant Public comment is being sought through August 18, 2011 on Kennecott’s request to install and operate a fifth ore grinding line and an ore sorting plant at the Copperton Concentrator. The new equipment will consist of an ore sorting plant with a baghouse, a…

  • Modification of Molybdenum Autoclave Process (MAP) Plant:
    Kennecott Utah Copper LLC

    The MAP facility is currently under construction, and commissioning is expected to start in 2013. Public comment is being sought through March 11, 2013 on Kennecott’s request to modify the design of the MAP plant. The design changes have resulted in the modification of the cooling tower. Kennecott will also add a natural gas-fired boiler,…

  • Document Repository: Cornerstone:
    Kennecott Utah Copper LLC Projects

    Jump to: Approval Order Issued Air Quality SIP Amendment This page provides links to documents associated with the various regulatory decisions by DEQ. Approval Order Issued (June 27, 2011) Final Permit (647 KB) Complete and Final Notice of Intent Final Notice of Intent (63MB) Cover—1.0 Introduction (384 KB) 2.0 Description of Emission Sources (72 KB)…

  • SIP Amendments: Cornerstone:
    Kennecott Utah Copper LLC

    By a vote of 5-4 in its May 4, 2011 meeting, the Air Quality Board approved the Amendment to the Utah State Implementation Plan, Emission Limits and Operating Practices, Section Ix.H.2.h, and to amend Rule R307-110-17, Section IX and Part H. The issue before the Board was whether or not the 2005 PM SIP (currently…

Back to top