June 11, 2004
- NRD Joint Proposal Narrative and Tables
- NRD Joint Proposal Figures
- Changes to Figures
- Figure 2.4A Jordan Valley Water Conservancy District Customers and Boundaries
- Figure 2.4B Jordan Valley Water Conservancy District Water System
- Figure 4.1A S.W. Jordan Valley Highest Sulfate Concentration Data
- Figure 5.2A Proposed Groundwater Extraction and Treatment System
- Figure 5.4A Zone A Plume—Treatment Flow Chart
- Figure 5.4B-D Zone B/Lost Use Integrated Design—Treatment Flow Chart
- Figure 6.3A Sulfate contours Layer 4 at 2025
- Figure 6.3B Sulfate contours Layer 4 at 2050
- Figure 8.5A JVWTP Groundwater Development Project in Southwest Salt Lake Valley, Absent Mining Contamination
- NRD Joint Proposal Appendices
- Appendix A. KUCC Groundwater Model
- Appendix B. Draft Explanation of Significant Differences
- Appendix B. Record of Decision (USEPA)
- Appendix C. Not Used
- Appendix D. Revised Flow and Transport Model for Southwestern Jordan Valley
- Appendix E. Letter to State Engineer and Groundwater Management Plan
- Appendix F. Allocation of Zone A Water to the Affected Municipalities
- Appendix G. Letters of Support from Affected Municipalities
- Appendix H. Pilot Study Final Report—Carollo Engineers
Contact Information
For more information on this project, contact Mazie Cox ([email protected]), (385) 391-8129.