2008
- Email from Dave Rupp (09/17/08)—Author: DRC
- Approval Letter
- DMT Attachments
- DMT Monitoring Plan
- Operations and Maintenance Plan (Approved, with 09/12/08 Attachments)
- O&M Plan Attachments (Initial Filling Plan, etc.) (09/12/08) (6 MB)
- Email from Harold Roberts (09/16/08)—Author: Denison
- Email from Harold Roberts (09/12/08)—Author: Denison (6 MB)
- Request for Information (09/10/08)—Author: DRC
- Approval of DSUA Cell 4A Construction Quality Assurance Report (09/09/08)—Author: DRC
- Email from Harold Roberts (09/02/08)—Author: Denison (9 MB)
- Request for Information (08/26/08)—Author: DRC
- Email from Dave Rupp (08/19/08)—Author: DRC
- Request for Information (08/18/08)—Author: DRC
- Email from Harold Roberts (08/15/08)—Author: Denison
- Email from Harold Roberts (08/11/08)—Author: Denison
- Request for Information (08/06/08)—Author: DRC
- Revised Reclamation Plan Approval and Request for Evidence of Surety (08/04/08)—Author: DRC (10 MB)
- Email from Harold Roberts (07/31/08)—Author: DRC (2MB)
- Cell 4A Operation Request for Information (07/29/08)—Author: DRC (3 MB)
- Construction Quality Assurance Report Findings and Request for Information (07/22/08)—Author: DRC
- Email from Harold Roberts; Revisions to the Cell 4A BAT Monitoring (07/16/08)—Author: Denison (19 MB)
- Geosyntec Consultants As-Built Report for Cell 4A (07/08)—Author: Denison (205 MB)
- June and Early July Emails: Subject: DUSA Cell 4A Construction: Two Items Noted (06/25-07/2/08)—Author: Denison/DRC
- Request for Information (06/23/08)—Author: DRC
- Request for Information (06/06/08)—Author: DRC
- Ground Water Discharge Permit (03/17/08 and 03/14/08)—Author: DWQ (3 MB)
2007
- Draft Ground Water Discharge Permit (10/25/07)—Author: DWQ
- Draft Statement of Basis (10/25/07)—Author: DWQ
- Response Letter (09/20/07)—Author: Denison
- Revised GCL Hydration Plan Approval (09/28/07)—Author: DRC
- Technical Specifications (09/27/07)—Author: Denison
- Email (0926/07 and 09/18/07)—Author: DRC
- Hydration of Geosynthetic Clay Liner (GCL) (08/31/07)—Author: Denison (6 MB)
- Design Approval Letter (06/25/07)—Author: DRC
- Summary of Documents Submitted to DRC (06/07)—Author: DRC
- Email from H.R. Roberts (06/22/07)—Author: Denison (2 MB)
- Email from H. R. Roberts (06/19/07)—Author: Denison
- Slimes Drain System (06/15/07)—Author: Denison
- Sandbag Placement Design (06/15/07)—Author: Denison
- Summary of Telephone Meeting (06/05/07)—Author: DRC
- Draft URS Technical Memo Regarding Round 7 Response (05/22/07)—Author: DRC
- Round 7 Response (05/15/07)—Author: Denison (3 MB)
- Round 7 Information Request (05/02/07)—Author: DRC
- Round 6 Response (03/28/07)—Author: Denison
- Round 6 Information Request and Interrogatory (URS) (02/08/07)—Author: DRC
- Round 5 Response (12/08/06)—Author: Denison (2 MB)
- Round 5 Letter (11/09/07)—Author: DRC
2006
- Round 5 Information Request
- Interrogatory (URS) (10/06/06)—Author: DRC (2 MB)
- Round 4 Response (08/29/06)—Author: Denison
- Round 4 Information Request and Interrogatory (URS) (07/20/06)—Author: DRC (2 MB)
- Seismic Analysis Email 6/23/2006—Author: DRC
- Round 3 Information Request and Interrogatory (URS) (06/22/06)—Author: DRC
- Round 2 Responses to Cell 4A Design Review (06/06)—Author: Denison (3 MB)
- Round 2 Information Request and Interrogatory (URS) (06/14/06)—Author: DRC
- Round 1 Responses to Cell 4A Design Review: (05-06/06)—Author: Denison (3 MB)
- Round 1 Information Request and Interrogatory (URS) (05/17/06)—Author: DRC
- IUC: Completeness Review Response 5/8/2006—Author: Denison (3 MB)
- Request for Additional Information (04/28/06)—Author: DRC
- URS: Results of Completeness Review (04/28/06)—Author: DRC
- Lining System Design Report (01/06)—Author: Denison (17 MB)