2011
- CQA Report Addendum and Response to DRC’s Email (01/27/11)—Author: Denison/Geosyntec
- Approval of Evidence of Surety (01/27/11)—Author: DRC
- CQA Report Approval (01/27/11)—Author: DRC
- BAT and O&M Plan Approval (01/26/11)—Author: DRC
- Approval of Reclamation Plan 3.2B (01/26/11)—Author: DRC
- Report Addendum and Request for Information 1/25/2011—Author: DRC
- Review of BAT and O&M Plans, and Request for Information (01/21/11)—Author: DRC
- BAT and O&M Plan Revision 2.2 (01/21/11)—Author: DUSA
- CQA Report Addendum 1; Response to DRC’s Letter Dated 01/20/11 (01/21/11)—Author: Denison/Geosyntec
- Contingent Approval Proposed DMT Plan (01/20/11)—Author: DRC
- Review of Construction and Request for Information (01/20/11)—Author: DRC
- Reclamation Plan Revision 3.2B (01/14/11)—Author: Denison (109MB)
- Reclamation Plan Revision 3.2A; Request for Information (01/12/11)—Author: DRC
- Revised DMT and BAT & O&M Plans (01/10/11)—Author: Denison
- Review of the DMT and O&M and Contingency Plans (01/06/11)—Author: DRC
2010
- Emails: GWDP Part 1.H.11 (12/16/10)—Author: Denison/Geosyntec
- Construction Deficiency Letter (12/09/10)—Author: DRC
- Reclamation Plan 3.2 and Request for Information (11/30/10)—Author: DRC
- Construction Inspection Observations (11/15/10)—Author: DRC
- DMT; BAT and O&M; and Contingency Plan Revisions (11/12/10)—Author: Denison (12MB)
- Commitment to Sandbag (10/08/10)—Author: Denison
- BAT O&M Plan (08/04/10)—Author: Denison
- Construction Inspection—Thin Sandbags and Request for Information (09/29/10)—Author: DRC
- Groundwater Discharge Permit (06/17/10)—Author: DRC