- Round 3 Response (09/11/09)—Author: Denison
- Round 3 Interrogatory (URS) (09/04/09)—Author: DRC
- Round 2 Response (08/07/09)—Author: Denison (2 MB)
- Round 2 Interrogatory (URS) (07/31/09)—Author: DRC
- Round 1 Response (01/09)—Author: Denison (73 MB)
- Revised Exhibit H Engineering Drawings: 1
- Revised Exhibit H Engineering Drawings: 2
- Revised Exhibit H Engineering Drawings: 3
- Revised Exhibit H Engineering Drawings: 4
- Revised Exhibit H Engineering Drawings: 5
- Revised Exhibit H Engineering Drawings: 6
- Revised Exhibit H Engineering Drawings: 7
- Revised Exhibit H Engineering Drawings: 8
- Round 1 Interrogatory (URS) (05/29/08)—Author: DRC
- Cell 4B Design Report (12/07)—Author: Denison (23 MB)