Aragonite Permit Attachment 10—Design Drawings:
Clean Harbors LLC

Below, find the Aragonite Permit Design Drawings from Attachment 10, including title and revision.

P&ID Legend Sheet 1 (unstamped)

D-034-PI-001

Revision: 3

Master Interlock System, Sheet 2

D-034-PI-004*

Revision: 24

Operating Interlock System, Sheet 1

D-034-PI-005*

Revision: 19

Operating Interlock System, Sheet 2

D-034-PI-006*

Revision: 11

P&ID Slagging Rotary Kiln System

D-034-PI-101

Revision: 19

P&ID Kiln Feed System

D-034-PI-102

Revision: 20

P&ID Kiln Miscellaneous Systems

D-034-PI-103

Revision: 8

P&ID Front Wall Burner Controls, Sheet 1

D-034-PI-105

Revision: 27

P&ID Front Wall Burner Controls, Sheet 2

D-034-PI-106

Revision: 37

P&ID Afterburner Controls, Sheet 1

D-034-PI-107

Revision: 23

P&ID Afterburner Controls, Sheet 2

D-034-PI-108

Revision: 26

P&ID Afterburner Controls, Sheet 3

D-034-PI-109

Revision: 14

P&ID Deslagging System

D-034-PI-110

Revision: 9

P&ID Spray Dryer Quench Tower

D-034-PI-201

Revision: 21

P&ID Baghouse

D-034-PI-202

Revision: 14

P&ID Saturator & Scrubber

D-034-PI-204

Revision: 15

P&ID 1st Stage Neutralization System

D-034-PI-205

Revision: 28

P&ID 2nd Stage Neutralization System

D-034-PI-206

Revision: 22

P&ID Soda Ash Storage Handling System

D-034-PI-207

Revision: 8

P&ID Spray Dryer Feed System

D-034-PI-208

Revision: 22

P&ID Cooling Tower

D-034-PI-209

Revision: 8

P&ID Wet Electrostatic Precipitator

D-034-PI-211

Revision: 4

P&ID I.D. Fan and Stack

D-034-PI-212

Revision: 4

P&ID Emergency Air/Water

D-034-PI-213

Revision: 8

P&ID Residue Handling Building

D-034-PI-214

Revision: 5

Piping Diagram CEM System #1

D-800-PI-215

Revision: 4

Piping Diagram CEM System #2

D-800-PI-216

Revision: 2

Activated Carbon Silo

D-034-PI-220

Revision: 2

PAC Dosing System Train 1

D-034-PI-221

Revision: 3

PAC Dosing System Train 3

D-034-PI-222

Revision: 3

P&ID Liquid Unloading Pumps

D-034-PI-300

Revision: 7

P&ID Waste Liquid Transfer Pumps

D-034-PI-301

Revision: 12

P&ID Direct Burn Waste Liquid Unloading

D-034-PI-302-1

Revision: 25

P&ID Direct Burn Waste Liquid Unloading

D-034-PI-302-2

Revision: 7

Sludge Pad Direct Burn Station

D-034-PI-302-3

Revision: 11

P&ID Feed Tanks Sheet 1

D-034-PI-303

Revision: 3

P&ID Feed Tanks Sheet 2

D-034-PI-304

Revision: 4

P&ID Liquids Storage

D-034-PI-305

Revision: 4

P&ID Liquids Storage

D-034-PI-306

Revision: 4

P&ID Liquids Storage Tanks, PE Stamped 01/15/21

D-034-PI-307

Revision: 8

P&ID Liquids Storage Tanks

D-034-PI-308

Revision: 6

P&ID Liquids Storage Tanks, PE Stamped 2/22/10

D-034-PI-309

Revision: 7

P&ID Liquids Storage Tanks

D-034-PI-310

Revision: 9

P&ID Blend & Transfer Pumps

D-034-PI-313

Revision: 4

P&ID Blended Liquid Feed & Transfer Pumps

D-034-PI-314

Revision: 5

P&ID Aqueous Feed Pumps

D-034-PI-315

Revision: 5

P&ID Hydrocarbon Vent System

D-800-PI-316

Revision: 19A

P&ID Vent System and Combustibles Analyzers

D-800-PI-317

Revision: 6

P&ID Compressed Gas Waste

D-034-PI-318

Revision: 6

P&ID Solids Handling

D-034-PI-401

Revision: 4

P&ID Sludge Handling

D-034-PI-402

Revision: 19

Bldg. E-4 Decant P&ID

D-800-PI-408

Revision: 8

P&ID Combustibles Monitoring System

D-800-PI-410

Revision: 24

P&ID Comb. Air Carbon Adsorption System

D-800-PI-411

Revision: 4

P&ID Fuel Oil/Outside Storage Tanks/Pumps

D-034-PI-601

Revision: 8

P&ID Area Sumps Sheet 1

D-034-PI-602

Revision: 5

P&ID Area Sumps Sheet 2

D-034-PI-603

Revision: 12

P&ID Air Compressor System

D-034-PI-604

Revision: 7

P&ID Nitrogen & Fuel Oil

D-034-PI-605

Revision: 15

P&ID Plant, Instrument Air & Propane

D-034-PI-606

Revision: 14

P&ID Plant Water, Runoff Water, Fire Water

D-034-PI-607

Revision: 4

P&ID Potable Water

D-034-PI-608

Revision: 11

P&ID Plant Water

D-034-PI-609

Revision: 14

Komar Shredder Feed System

D-034-PI-701

Revision: 0

Komar Airlock

D-034-PI-702

Revision: 1

Komar Dual Shredder System

D-034-PI-703

Revision: 0

Screw Conveyor to Auger Kiln Feed

D-034-PI-704

Revision: 0

Komar Kiln Feed Auger System

D-034-PI-705

Revision: 0

Overall Flow Scheme

D-034-PF-100

Revision: 15

Process Flow Diagram – Typical December 1997

D-800-PF-275

Revision: 1

Process Flow Diagram – Typical December 1997

D-800-PF-276

Revision: 1

Liquids Handling (Tank Farm) – Flowsheet

D-034-PF-301 Sheet 1 of 2

Revision: 12

Liquids Handling (Tank Farm) – Flowsheet

D-034-PF-301 Sheet 2 of 2

Revision: 7

Direct Burn & Cylinder Material Handling – Flowsheet

D-034-PF-302

Revision: 12

Process Flow Diagram – Barrel Handling

D-034-PF-401

Revision: 9

Sludge and Bulk Solids Handling – Flowsheet

D-034-PF-402

Revision: 9

Closed Vent System Flowsheet

D-034-PF-603

Revision: 10

Hydrocarbon Vent System Flow Diagram

D-034-PF-604

Revision: 9

Site Plan

D-034-M-001

Revision: 13

Plot Plan

D-034-M-002

Revision: 36

Sump and Sump Pump Location

D-034-M-002-SP

Revision: 27

Safety Equipment Plan

D-034-M-005

Revision: 29

Cylinder Storage Area Plot Plan

D-034-M-401

Revision: 0

Container Storage Building Plan

D-800-M-402

Revision: 18

Material Handling Area Plan

D-800-M-403

Revision: 11

Shredder Tower Barrel Storage Area

D-800-M-500

Revision: 2

Explosives Handling and Storage

D-800-M-502

Revision: 0

Area Site Plan

SK-090-997-AR

Revision: 5

* NOTE: These drawings include interlocks that are not required by this permit. They are required by other permits and are included in these drawings to avoid the confusion caused by two sets of interlock drawings.

Contact

Gabrielle Marinick, [email protected], (385)499-0172

Back to top