Public Information
- Notice: Public Comment/Public Hearing Information Meeting on Site Management (05/06/10 to 06/07/10)
- Site Management Plan for the Ensign-Bickford Company, Spanish Fork, Utah Includes the Environmental Covenant. (30 MB)
- Corrective Action Order
- Corrective Action Order: Consolidation CAMU
- Flow Diagram for Incinerator
- Notice: Public Comment/Public Hearing Information Meeting on Site Management (05/06/10 to 06/07/10)
- Site Management Plan for the Ensign-Bickford Company, Spanish Fork, Utah. Includes the Environmental Covenant. (30 MB)
- Soil Excavation Volumes
- Thermal Treatment Fact Sheet
Work Plan
- Title Page
- Table of Contents and Main Text
- Appendix A: Treatment Goals for Soil Interim Measures Forward Risk Assessment Results
- Appendix C: Astec TTU System Interlocks Controls Schedule
- Appendix D: Thermocouple Photographs
- Appendix E: ESMI Operators Log
- Appendix F: RFI Soils Data Representative of Test Burn Stockpile
- Appendix F: Locations, Primary Constituent Class, USCS Soil Classification, and Approximate Volumes of Soils Comprising the Test Burn Stockpile
- Table 7.1: Estimated Average COPC Concentrations for Minimum Interim Measure Soil Volume
- Figure 8-2: Thermal Treatment Process Schematic
- Figure 8-3: On-Site Soil Management Operations Schematic
- Figure 8-4: Approximate Locations of Soils Containing Lead Concentrations in Excess of Applicable Risk-based Criteria
Photos
![Ensign-Bickford Company Soil Cleanup: contaminated soil excavation and staging](https://deq.utah.gov/wp-content/uploads/Ensign-Bickford-Excavation-Staging-01.jpg)
![Ensign-Bickford Company Soil Cleanup: contaminated soil excavation and staging](https://deq.utah.gov/wp-content/uploads/Ensign-Bickford-Excavation-Staging-02.jpg)
![Ensign-Bickford Company Soil Cleanup: contaminated soil excavation and staging](https://deq.utah.gov/wp-content/uploads/Ensign-Bickford-Excavation-Staging-03.jpg)
![Ensign-Bickford Company Soil Cleanup: contaminated soil excavation and staging](https://deq.utah.gov/wp-content/uploads/Ensign-Bickford-Excavation-Staging-04.jpg)
![Ensign-Bickford Company Soil Cleanup: Excavated Soil is Weighed](https://deq.utah.gov/wp-content/uploads/Ensign-Bickford-Weighed-Screened.jpg)
![Ensign-Bickford Company Soil Cleanup: thermal treatment unit](https://deq.utah.gov/wp-content/uploads/Ensign-Bickford-2006-05-01-Thermal-Treatment.jpg)
![Ensign-Bickford Company Soil Cleanup: post treatment sampling](https://deq.utah.gov/wp-content/uploads/Ensign-Bickford-2006-05-01-Treatment-Unit.jpg)
![Ensign-Bickford Company Soil Cleanup: steam plume](https://deq.utah.gov/wp-content/uploads/Ensign-Bickford-2006-05-01-TTU-Steam-Plume.jpg)
![Ensign-Bickford Company Soil Cleanup: scaffolding next to the thermal treatment unit allows testers to position equipment](https://deq.utah.gov/wp-content/uploads/Ensign-Bickford-2006-05-01-Scaffolding.jpg)
![Ensign-Bickford Company Soil Cleanup: afterburner and quench tower](https://deq.utah.gov/wp-content/uploads/Ensign-Bickford-Afterburner-and-Quench.jpg)
![Ensign-Bickford Company Soil Cleanup: thermal treatment unit baghouse](https://deq.utah.gov/wp-content/uploads/Ensign-Bickford-Thermal-Baghouse.jpg)
Questions
For more information, contact Paige Walton (pwalton@utah.gov).