Public Information
- Notice: Public Comment/Public Hearing Information Meeting on Site Management (05/06/10 to 06/07/10)
- Site Management Plan for the Ensign-Bickford Company, Spanish Fork, Utah Includes the Environmental Covenant. (30 MB)
- Corrective Action Order
- Corrective Action Order: Consolidation CAMU
- Flow Diagram for Incinerator
- Notice: Public Comment/Public Hearing Information Meeting on Site Management (05/06/10 to 06/07/10)
- Site Management Plan for the Ensign-Bickford Company, Spanish Fork, Utah. Includes the Environmental Covenant. (30 MB)
- Soil Excavation Volumes
- Thermal Treatment Fact Sheet
Work Plan
- Title Page
- Table of Contents and Main Text
- Appendix A: Treatment Goals for Soil Interim Measures Forward Risk Assessment Results
- Appendix C: Astec TTU System Interlocks Controls Schedule
- Appendix D: Thermocouple Photographs
- Appendix E: ESMI Operators Log
- Appendix F: RFI Soils Data Representative of Test Burn Stockpile
- Appendix F: Locations, Primary Constituent Class, USCS Soil Classification, and Approximate Volumes of Soils Comprising the Test Burn Stockpile
- Table 7.1: Estimated Average COPC Concentrations for Minimum Interim Measure Soil Volume
- Figure 8-2: Thermal Treatment Process Schematic
- Figure 8-3: On-Site Soil Management Operations Schematic
- Figure 8-4: Approximate Locations of Soils Containing Lead Concentrations in Excess of Applicable Risk-based Criteria
Photos
Questions
For more information, contact Paige Walton ([email protected]).