Example Appendix H BMP Specifications (Construction Storm Water):
UPDES Permits

  • 2.1 SWPPP Sign
  • 2.2.1 Steel Plate and Marker
  • 2.3.1 LOT Cut Down
  • 2.3.2 Gutter Dam
  • 2.3.3 Mechanical Sweeping
  • 2.3.4 Manual Sweeping
  • 2.3.5 Topsoil Preservation Policy
  • 2.4.1 Hose
  • 2.5.1 Scrape Tires
  • 2.5.2 Parking Pad
  • 2.5.3 Forklift Policy 1
  • 2.5.3 Forklift Policy 2
  • 2.6.1 Trash Receptacle
  • 2.6.2 Heavy Trash Policy
  • 2.6.3 Construction Spoil Envelope and Policy
  • 2.6.4 Portable Toilet
  • 2.6.5 Concrete Washout
  • 2.6.6 Dirt Gutter Dams
  • 2.7.1 Storage Policy
  • 2.7.2 Utility Backfill Staging
  • 2.7.3 Landscaping Backfill Staging Zone
  • 2.8.1 Backyard Stabilization Plan
  • 3.0 Spill Control Plan
  • City Minimums

Program Contacts

Construction Storm Water

Kelsee York ([email protected]) (385) 260-2760

Manager

Jeanne Riley ([email protected])(801) 536-4369

Storm Water Specialist

Carl Adams ([email protected]) (801) 536-4330

Storm Water Inspector

Kelsee York ([email protected]) (385) 260-2760

Storm Water Database

[email protected] (801) 536-4300


Last Updated:

Categories:

Back to top